Identifikasi Waste menggunakan Metode Borda dan Penerepan Lean Construction Tools dengan Root Cause Analysis (Studi Kasus: Proyek Pembangungan Gelanggang Inovasi dan Kreatif Universitas Gadjah Mada)
link : https://journal.pubmedia.id/index.php/civilengineering/article/view/3001
Analysis of Quantity Take Off Deviation Using BIM Method (Case Study of Construction of a Satpol PP Building)
link : https://journal.pubmedia.id/index.php/civilengineering/article/view/2828
Analisis Value Engineering Pada Proyek Pembangunan Gedung Dengan Metode Analytical Hierarchy Process (AHP)
link : https://journal.pubmedia.id/index.php/civilengineering/article/view/3064
Comparative Analysis of Conventional Methods with BIM Methods on Construction Cost Estimate at Structure Project Design Calculations (Case Study of Construction of A Satpol PP Building)
link : https://journal.pubmedia.id/index.php/civilengineering/article/view/2698
Penerapan Rekayasa Nilai dengan Metode Zero-One pada Pekerjaan Struktur Jembatan (Studi Kasus: Proyek Bridge and Road at East Access PT Indah Kiat Karawang)
link : https://journal.pubmedia.id/index.php/civilengineering/article/view/3110
PERBANDINGAN BIAYA DAN WAKTU ANTARA METODE KONVENSIONAL DENGAN METODE MODULAR MENGGUNAKAN MICROSOFT PROJECT
link : https://jurnal.uns.ac.id/jrrs/article/view/95314
ANALISIS EARNED VALUE TERHADAP BIAYA DAN WAKTU GEDUNG DIREKTORAT POLITEKNIK PU SEMARANG DENGAN PRIMAVERA P6
link : https://jurnal.uns.ac.id/jrrs/article/view/85304
Value Engineering Analysis on Building Structure (Case Study: Java Steam Power Plant 9&10 2x1000 MW Suralaya Project)
link : https://journal.pubmedia.id/index.php/civilengineering/article/view/2835/2881